Everyone
did a good job today by removing and packing their instruments, tools and spare
parts. The container got more and more empty and quit. Also the heavy high-volume
sampler found its way back to the ground, even if the workers from the forest
department had to help.
INUIT-BACCHUS-ACTRIS Cyprus 2016
Mittwoch, 27. April 2016
26.04.2016-Last coupling experiment between FINCH and IN-PCVI
During the
last 4.5 weeks we performed around 40 of these coupling experiments. Some of us
were a bit sentimental and counting down the last seconds of the last coupling
experimentJ.
The measurements at PM1 and PM10 inlet continue until tomorrow morning. Then we
will pack and prepare everything for our departure.
Dienstag, 26. April 2016
26.04.2016
Moving
forward to the end of the campaign, the graph below summarizes the OPC
concentration at PM10 inlet from April, 3 until April, 24. Higher particle
concentration at sizes greater than 1 µm around April, 10 and April, 16 point out the two dust events measured during the campaign.
25.04.2016
Monday
morning started as usual with a meeting at the Cyprus Institute discussing
recent preliminary data from different groups and instruments. During the last days,
dust did not show up again.
Freitag, 22. April 2016
22.4.2016
Back to
work and at station Agia Marina, measurements continue but the PM10 concentration
is still quite low with 7-8 ug/m^3. We hope to get again higher
concentrations within the next days. ALABAMA did not measure today due to a
change of our ablation laser head.
21.4.2016- Day off
Today we
had again a really nice and funny day off at the beach and in the old town of
Nicosia.
Abonnieren
Posts (Atom)