Today we first went to the Cyprus Institute to meet the colleagues from there. They support our field campaign in many ways (logistics, infrastructure, science) and the run the field station where we will put up our instruments. They even bought a new measurement container for us! Also, we shipped all our equipment to the institute and were eager to see if everything has arrived. And it had!
So after a first introduction meeting we loaded all the equipment on a truck and went to the field site, where we unloaded the truck and started with the setup. Although we had a long day, we are far from finished. But at least (among other stuff) we managed to setup one inlet line, the PM1 inlet (for particles smaller than 1 µm):